I was trying to document this entire process in steps but towards then end, things started happening fast and I was so busy I didn’t get the best pictures of everything in process. So for clarification sake Step 17 was the installation of all the interior trim and doors. Step 18 was the installation of the kitchen and bathroom cabinets and counter tops. Step 19 was the installation of the tile in the bathrooms, and step 20 was the installation of final plumbing and electrical fixtures. In our previous posts you can see some of the trim, cabinets, counter tops, tile and fixtures. Once we get things wrapped up and cleaned up we will post detailed pictures of the final product. Coming soon!